Demolition contractor for Sunnyvale and Santa Clara County

Request a demolition quote →
Get a Quote
Dozer kicking up dust while clearing a field (Sunnyvale Demolition Pros)

Peery Park tilt-up demolition

Demolition Contractor in Peery Park, Sunnyvale

Peery Park is the older R&D and light industrial district in northwest Sunnyvale, roughly between Mathilda Avenue and Mary Avenue, tucked against Highways 101 and 237. Its buildings are smaller and more varied than Moffett Park's, and the demolition work reflects that.

Tilt-Up Building Demolition in Peery Park

Many Peery Park buildings are single-story concrete tilt-ups with roll-up doors, a front office area and a high-bay warehouse or production space behind it. They were built for small manufacturers, electronics firms and suppliers. The Peery Park Specific Plan, adopted in 2016, encourages replacing older buildings with denser office and R&D space, so a steady flow of these sites is being cleared.

Tilt-up panels are taken down after the roof structure is released and the panels are braced or pulled inward. Each panel is broken on the slab, the rebar separated, and the concrete hauled for crushing. On sites with several buildings or an occupied neighbor sharing the parcel, we phase the work and keep fire lanes open.

Multi-story building partly demolished with floors exposed (Sunnyvale Demolition Pros)

Industrial Floors, Pits and Machine Foundations

Light industrial buildings leave things in the floor that offices do not. We regularly find trench drains, sumps, clarifiers, equipment pits, crane rail footings and thick machine foundations poured years after the original slab. Each of these is located and removed as the slab comes out, and anything that held process water or chemicals is checked with the owner's environmental consultant first.

That is why we ask for the building's tenant history before pricing a Peery Park job. A former office tenant leaves a plain slab. A former machine shop or plating operation can leave a floor that takes several times longer to remove, plus closure steps with the city's hazardous materials program.

Strip-Outs and Partial Demolition for Renovation

Not every Peery Park building is torn down. Some owners keep the tilt-up shell and renovate it for a new tenant, adding skylights, new storefronts and modern systems. That calls for an interior strip-out back to shell plus partial demolition: cutting new openings in panels where the engineer allows, removing old mezzanines, taking off the roof covering, and demolishing the old office build-out.

Strip-outs in occupied multi-tenant buildings are common too. We work to the landlord's return condition, use the loading door for debris, and schedule loud work around neighboring tenants.

Dump truck unloading broken concrete (Sunnyvale Demolition Pros)

Permits and Surveys for Peery Park Demolition

Peery Park is entirely within the City of Sunnyvale, so demolition permits come from the Building Safety Division. Every structure gets an asbestos survey, and a certified abatement contractor clears anything positive before demolition. The Bay Area Air Quality Management District is notified ahead of the start date. Gas and electric services are pulled by PG&E; the water, sewer and fire lines are a city matter.

Sites larger than an acre also need state stormwater coverage during demolition, and all sites need dust control. Because some parcels sit close to homes on the district's edges, we keep noise and truck traffic within the hours the city sets.

Peery Park Demolition Work We Handle

01

Tilt-Up Building Removal

Concrete panels, roof structures and slabs are demolished in sequence, with concrete crushed for reuse and rebar and steel sent to scrap.

02

Industrial Slab and Pit Removal

Trench drains, sumps, equipment pits and machine foundations are located and removed, with environmental checks first where the past use calls for them.

03

Shell Strip-Outs for Renovation

Office build-outs, mezzanines and old systems are removed so a tilt-up shell can be renovated, with panel openings cut only where the engineer approves.

04

Multi-Tenant Building Demo

Suites in occupied buildings are stripped with loading-door access, protected common areas, and loud work timed around neighboring tenants.

Demolition FAQs

Peery Park Demolition FAQ

Why does the past tenant of a Peery Park building matter for demolition?

Manufacturing tenants leave pits, drains and thick machine foundations, and may require hazardous materials closure. An office tenant leaves a simple slab. It changes time and cost.

Can you strip a tilt-up building back to its shell instead of demolishing it?

Yes. We remove interiors, mezzanines and roof coverings and cut new openings where the engineer approves, leaving the panels and structure for renovation.

What permits does Peery Park demolition need?

A City of Sunnyvale demolition permit, air district notification, utility removal approvals and, for larger sites, state stormwater coverage. Hazardous materials closure may also apply.

What affects the cost of demolishing a tilt-up?

Building area, panel height and thickness, roof type, floor features from past uses, asbestos findings and paving to remove. Occupied neighbors add phasing time.

Crew breaking concrete with jackhammers (Sunnyvale Demolition Pros)

Demolition quote

Request a Peery Park Demolition Quote

Tell us about the building, its past tenants and whether it is coming down or being renovated. We answer within 24 hours and set up a site walk.

  • Permits
  • Demolition
  • Haul-off

Request a Demolition Quote

Tell us about the job. We reply within 24 hours.

We will reach out via phone or email within 24 hours.

Get a Demolition Quote